IBEW Local 131 Job Information Page
Book 1: 24
Book 2: 7
Click Here for Book 1 and Book 2 Referral and Resign Information
BOOK 2 SIGNS ARE TO BE DONE BY EMAIL/FAX FROM HOME LOCAL or IN PERSON
TO BID ON A NEW CALL:
You must leave a message on the Job Line between 5:00 P.M. and 8:00 A.M.
Anyone ineligible for a call due to vaccine status or background check must call the jobline each call to prevent a strike/ding
(269) 382-1762
TO ACCEPT AN OPEN CALL:
Please call the Hall during normal business hours.
(8:00 A.M. to 4:30 P.M.)
New Call Open Call Closed Call
Click here for Michigan State Licensing Information
Click here JIW Wage Breakdown
Martell Electric -
(1 JIW), Fire Alarm and Underground Fiber, Various
Start Date: 2/7/25; 7AM - 330PM; Indefinite
Current MUST Drug Test, Background Check
Champion Specialty Services - Book I 15, 16, 17, 18, 19, 20
(6 of 6 filled) JIW - Palisades Nuclear Plant; 5x10's
Start Date: 2/25/2024 CSS In-Processing, 7AM-530PM
Contractor Drug Testing Required, background Check, NMAP qualifications required
Incentive of $15 over scale for qualified Journeymen upon evaluation by Champion: incentive agreement
Hi Tech Electric - CE Bk #1
(1 ) CE - Various Locations, Commercial/Residential, posted 1/30
Start 2/4/25, 1st shift, 7AM to 330PM
MUST Drug test, Background Check Required
Moore Electrical - CE (#2)
(1 CE); Various locations, Posted 1/30
Start 2/3/25, 6am - 2:30pm, Indefinite
MUST drug test, Background Check Required
Hi Tech Electric - CE (#1)
(1 ) CE - Various Locations, Commercial/Residential, posted 1/30
Start 2/3/25, 1st shift, 7AM to 330PM
MUST Drug test, Background Check Required
Martell Electric - # 12
(1 JIW), Residential Service Vehicle, controls, and fiber splicing experience
Start Date: 1/29/25; First Shift; Indefinite
Current MUST Drug Test, Background Check Required
Martell Electric - #1 (VDV)
(1 VDV Tech), Fiber and Underground, Various Locations
Start Date: 1/28/25, First Shift, Indefinite
MUST Drug Test and Background Check Required
Champion Specialty Services - Daybook x 4
JIW - Palisades Nuclear Plant; 5x10's
Start Date: 1/6/2024 CSS In-Processing; Holtec ACCESS mid-January
Contractor Drug Testing Required
Martell Electric - Daybook
(1 CE), Residential Service Vehicle
Start Date: 1/22/25; First Shift; Indefinite
Current MUST Drug Test
Hi-Tech Electric - (3) Book 2, (1) Book I, Daybook - Closed
(7 of 8 JIW Filled, increased April 3rd), Pfizer
Start 7:00AM - 3:30PM; Indefinite
Background Check; MUST Drug Test
Hi Tech Electric - Day Book
(1 of 1 filled) CE - Various Locations, Commercial/Residential
Start 1/27/25 @ 8AM, 1st shift, 7AM to 330PM
MUST Drug test, MI State License, Background check required
Hi-Tech Electric - (1) Book 2, (2) Book 1, Daybook
(4 of 5 JIW Filled), Pfizer, Posted 9/12/2024
Start Date: 9/16/2024; 7:00AM - 3:30PM; Indefinite
Background Check; MUST Drug Test
Hi-Tech Electric -
(1 JIW), Service Vechicle
Req. Date: 7/10; Start Date: 7/11; First Shift; Indefinite
Background Check, Current MUST Drug Test; MI State Journey License, 2 forms of ID
Hi Tech Electric - Cancelled
(4) JIW - Various Locations
Start 11/4/24 @ 8AM, 1st shift, 7AM to 330PM
MUST Drug test, MI State License, Background check required
Hi Tech Electric - Daybook
(1) CE - Various Locations
Start 1/6/24 @ 8AM, 1st shift, 7AM to 330PM
MUST Drug test, Background check required
KEI ECM : Cancelled
(3 JIW ); Various Locations; 40 hours; Indefinite Call
Req. Date: 11/22/24, Start Date: 11/25/24
Champion Specialty Services -
Palisades Nuclear Plant,2 JIW, (Posted 10/31/24)
Start Date: 11/11/24; 4 x 10's;
Contractor Drug Testing, Background Check
Hi Tech Electric - daybook x 1 cacelled
(1 of 3 filled) CE - Various Locations
Start 10/28/24, 7:00AM - 330PM
MUST Drug test, Background check required
Champion Specialty Services -
Palisades Nuclear Plant, 8 JIW, (Posted 10/18/24)
Start Date: 11/11/24; 5 x 10's; Estimated until 6/30/25
MI JIW License, Contractor Drug Testing, Background Check
Champion Specialty Services -
(Posted 9/9/24; Start Date 9/30/24)(2 JIW Needed), Palisades Nuclear Facility - Maintenance Coverage
Report: two weeks after bidding, 6:30AM to 5:00PM, M-F 10 hours (50 Hours/week) updated 10/1
Background check, Drug Testing
Champion Specialty Services -
(Posted 8/12/24; Start Date 9/3/24)(3 JIW Needed), Palisades Nuclear Facility - SMR Project
Report: two weeks after bidding, 6:30AM to 5:00PM, M-F 10 hours (50 Hours/week) updated 10/1
Background check, Drug Testing
Champion Specialty Services - Daybook x 4
(Posted 5/20/24, Updated 8/12) (4 of 13 JIW filled), Palisades Nuclear Facility (Working under Local 131 contract / Recommissioning Labor Agreement)
Report: two weeks after bidding, 6:30AM to 5:00PM, M-F 10 hours (50 Hours/week) updated 10/1
Background check up to 2 weeks before start
Contractor Drug Testing, Background Check, NMAP
IBID Electric - #24, Day book
Welch's (Lawton, MI), 2 JIW, (Posted 10/8/24)
Start Date 10/10/24, 6AM Start, 6x 10s , M-Sat some Sundays, 2 month call (thru Dec)
Lift Cert required, edited 10 24 24
Martell Electric
1 VDV Tech - Palisades Nuclear Plant
Posted: 10/8; Start Date: 10/14; 4-10's M-Th; Indefinite
Drug Testing; Background Check
Hi-Tech Electric - cancelled
(2 Instrument Tech, 12.5% over scale), Pfizer, Posted 9/12/2024
Start Date: 9/16/2024; 7:00AM - 3:30PM; Indefinite
Background Check; MUST Drug Test. EPRI Level 2 or equivalent
Martell Electric - cancelled
(1 JIW), Service Vehicle
Start Date: 9/17; First Shift; Indefinite, posted 9/16
Current MUST Drug Test
Hi-Tech Electric -
(1 CE), Service Vechicle
Start Date: 9/18; First Shift; Indefinite, posted 9/16
Background Check, Current MUST Drug Test; MI State Journey License, 2 forms of ID
Moore Electrical -
(1 JIW); Various locations, Posted 9/16
6am - 2:30pm Mon - Fri Indefinite, Start 9/18
MI JIW License, MUST drug test, Background Check
Hi-Tech Electric
2 CE's; Various Locations
Posted: 8/28; Start Date: 9/3; Indefinite
Required: MUST drug test
IBID Electric - #10 & #14
Welch's (Lawton, MI), 2 JIW, (Posted 9/12/24)
Start Date 9/16/24, 6AM Start, 6x 10s , M-Sat, 3+ month call (thru Dec)
MI State Electrical License Required, Lift Cert. required
Martell Electric
1 VDV Tech - Palisades Nuclear Plant
Posted: 9/10; Start Date: 9/23; 4-10's M-Th; Indefinite
Drug Testing; Background Check
KEI ECM
(4 of 4 JIW Filled); Various Locations; 40 hours; Indefinite Call
Req. Date: 5/28/24; Start Date: ASAP
KEI Electric
(2 of 2 filled VDV/Low Volt Techs), Various Locations
Req. Date 7/10/24, Start 7/15/24,
Schedule: 40-hrs, M-F
KEI Electric : Closed
(2 of 3 JIW Filled), reduced 9/4, Graphic Packaging Inc, Kalamazoo
Req. Date: 7/2/2024, Start: 7/12/24
Schedule: 1 week Shutdown w/ Overtime, 1-2 week short call (updated 9/4)
SS Card, ID Required
Moore Electrical Services - (#13)
(Posted 8/23/24; Start Date 8/29/24) 2 of 2 JIW Filled; Zoetis & Various
5 x 10's & 8's on Saturdays (6am-4:30PM M-F)
Req: MI State JIW License; MUST drug test within 90 days, background check
Sunstone Building - #2
(1) JIW; MI State Journeyman Electrical License
Posted 9/4; Start 9/9 @7:00AM 4-10's with some OT, Indefinite Call
MI State Journeyman License
Lakeland Electrical Services - Cancelled
(2) JIW; Pfizer - Portage
Posted: 8/29; Start 9/3 @ 7:00AM; Working M-F 7AM-5:30PM; 4-6 Week Call
Requirements: MI JIW License & Drug Testing
Fuller Electric - #24
(1 JIW); Various Locations
Req. Date: 8/26/24; Start Date: ASAP
Required: Drug testing and Master JIW License
Hi-Tech Electric -
(0 of 3 JIW Filled) (0 of 1 CE Filled); Various Locations, Contractor Closed 8/21/24
Req. Date: 6/3; Start Date: 6/10 - 8:00am @ Shop
MI JIW License, MUST Drug Test, Background Check
Moore Electrical - Daybook
(5 of 7 JIW Filled, Contractor Closed 8/21/24); Zoetis B248, Req 6/20
(5x10's, 8's Sat) 6am - 4:30pm Mon - Fri; 6am - 2:30pm on Saturday; Indefinite, Start ASAP
MI JIW License, MUST drug test within 60 days, Background Check
Hi-Tech Electric - Day book x 3 - Updated 6/6/24, increased to 3 CE's
(2 JIW Filled & 2 of 3 CE Filled - Contractor closed 8/21/24), Various Locations
Req. Date: 3/26; Start Date: 3/28; 7:00AM - 3:30PM M-F; Indefinite
Background Check; MUST Drug Test; MI State JIW License
Nitro Electric - (2) Book 2
(3 of 5 JIW Filled), Vicksburg High School
Req Date 6/11; Start 6/13 @ 7:00AM - 3:30PM
2 forms of ID for on-boarding
Martell Electric - Contractor Cancelled Call 8/20/2024
(1 of 2 JIW filled) - Various Locations; Indefinite
Req. Date: 7/8/24; Start Date: 7/9/24
MUST Drug Test Required, 2 forms of ID
Nitro Electric
(0 of 2 JIW filled) Consumers Concrete (Kalamazoo), Posted 6/27/24
Shift: Six 8-hour days, Mon-Sat, Less than 80 hour Short Call Updated 7/24/24
2 forms of ID required
Martell Electric -
(0 of 1 JIW Filled - 0 of 1 CE Filled) Service - Various Locations; Indefinite
Req. Date: 6/21/24; Start Date: 6/24/24
MUST Drug Test Required
Buford Electrical Services
(1 CE), Various Locations
Req. Date: 8/8/24, First Shift, Short Call
Hi-Tech Electric - cancelled
(0 of 1 - 12.5% Foreman), Various Locations
Req. Date: 6/28; Start Date: ASAP; 7:00AM - 3:30PM M-F; Indefinite
Position Contingent on Interview, Current MUST Drug Test; MI State Journey License
Hi-Tech Electric - Cancelled
(1 of 8 JIW Filled) updated 7/10, Abbott Laboratories Summer Shutdown, Sturgis, MI
Req. Date: 7/2/2024; Start Date: July 15th
Schedule: 6x10's, Mon. - Sat. w/ Some Sundays; 6 Week Call
Captive boots, $150 Stipend for new boots with 1st check, must have new & clean boots for jobsite
Gurtz Electric: closed
(2 of 4 JIW Filled, 12.5% over scale), updated 7/8/24, Pfizer MAPS
Req. Date 7/3/2024, Start 7/11/2024
Schedule: 50hrs 7AM to 5:30PM, Mon-Fri, 8-10 weeks
Contractor Onsite Drug Testing, Tobacco Free Site
KEI Electric (closed)
(2 of 4 JIW filled, 12.5% over scale, $45.91), Various Locations
Req. Date 7/8/24, Start 7/9/24,
Schedule: 40-hrs minimum, overtime available
KEI Electric
(0 of 8 JIW Filled), Abbott Laboratories Summer Shutdown, Sturgis, MI
Req. Date: 7/2/2024, Start: 7/12/24
Schedule: 5-10s Mon-Fri (some Sat & Sun), 6-8 week duration
SS Card, ID Required, New captive boots required with $150 Stipend
Hi-Tech Electric - closed
(0 of 1 JIW Filled) **Updated 6/3/2024
South Haven Water Treatment Plant & Various Locations; 7am-3:30pm
Req. Date: 5/15/24; Start Date: 5/20/24; Duration: Through Summer 2025
Required: MI JIW License & MUST Drug Test
KEI Electric Closed
(1 of 4 JIW Filled), Graphic Packaging Inc (Kalamazoo)
Req Date 6/18, Start 6/19 through September, 7:00AM-3:30PM, M-F, possible OT
SS Card, ID Required
KEI ECM closed
(1 of 4 JIW Filled); Various Locations; 40 hours with occasional OT; Indefinite Call
Req. Date: 5/28/24; Start Date: ASAP
Moore Electrical -
(1 CE); Shop
6am - 2:30pm Mon - Fri Indefinite, Start ASAP
MI JIW License, MUST drug test, Background Check
Moore Electrical - Cancelled
(0 of 1 JIW Filled); Zoetis Downtown Kalamazoo
7am - 3:30pm Mon - Fri Indefinite, Start ASAP
MI JIW License, MUST drug test within 60 days, Background Check
Hi-Tech Electric
(1 JIW filled); Kalamazoo College; 7am - 3:30pm M-F; Indefinite
Req. Date: 6/3; Start Date: 6/5 - 8:00am @ Shop
MI JIW License & MUST Drug Test
Moore Electrical - Contractor Canceled Call 6/19/24
(2 of 4 JIW Filled); Gun Lake Casino; 6am - 2:30pm M-F; Indefinite
Req. Date: 6/4; Start Date: 6/10 @ 6am
Requirements: MI JIW License, Background Check, Current MUST Drug Test
Moore Electric - (1) Daybook & Contractor canceled remaining call 6/17/24
Cancelled (3 JIW, 1 FRMN 12.5%) Pfizer
Req. Date 6/10; Start 6/12, 7:00am to 3:30pm, possible OT
Background check, MI JIW License, MUST Drug Test, 2 forms of ID
Fuller Electric
(1 of 1 JIW Filled); Various Locations; 7am - 3:30pm M-F; Indefinite
Req. Date: 6/4; Start Date: 6/17 @ 8am
Requirements: MI Master's License, MI JIW License, Welder, Experience in Generators, Residential, and Service
Hi-Tech Electric - Contractor Closed Call 6/17/24
(1 JIW), American Axle Manufacturing, Three Rivers
Shift: 6AM to 230PM
Req. 5/31/2024, Start 6/03/24, Indefinite
Mi State License Required, current MUST Drug Test
Moore Electrical - This call has been updated 4/24**
(4 of 4 JIW Filled, increased April 24th); Zoetis B248 - Various
(5x10's, 8's Sat) 6am - 4:30pm Mon - Fri; 6am - 2:30pm on Saturday; Indefinite, Start ASAP
MI JIW License, MUST drug test within 60 days, Background Check
Martell Electric - (1) Book 2
(1 of 2 JIW Filled) Woods Lake - Lighting Project
Start Date: 5/28/2024; 6:00am - 2:30pm M-F; Short Call
MUST Drug Test Required
Linear Electric - Book 2
(1 JIW) Paw Paw Schools; 7am - 3:30pm M-F; 4 Month Call
Req. Date 6/5; Start Date: 6/10; Report to Jobsite
Required: MI JIW License & Background Check
Linear Electric - #6
(1 JIW); Paw Paw School; 7am - 3:30 M-F; 7 Month Call
Req. Date: 6/4; Start Date: 6/7; Report to Jobsite
Hi-Tech Electric - Contractor Canceled Call 6/5/24
(1 JIW); Meijer Remodel; Three Rivers
Shift: 7AM to 330PM
Req. Date: 5/31/2024; Start Date: 6/03/2024; Duration: 9-10 Months
Required: MI State JIW License and current drug test
KEI Electric - #7 & Daybook
(2 JIW) - Multiple Locations
40 hour indefinite call, 7AM Start
Req. Date: 5/13/24
Nitro Electric - Daybook
(2 JIW) Consumers Block Plant - Kalamazoo
7am-3:30pm M - F; Indefinite
Req. Date: 4/29/24
Hi-Tech Electric - Daybook
(1 JIW); Meijer Remodel; Three Rivers
Req. Date: 5/13/2024; Start Date: 5/14/2024; Duration: 10 Months
Required: MI State JIW License and current drug test
IBID Co. Electric: Bk1 #1 & 2
(2 JIW); Welch's - Paw Paw
Req. Date: 5/1; Start Date: 5/6; 6am Start; 5x10's, then 6x10's; 8 Months Duration
MI JIW License, Safety Glasses & Steel Toed Shoes
Moore Electrical -
(1 JIW); Pfizer
Req. Date: 4/29; Start Date: 5/6; 7:00AM - 3:30PM; Indefinite
Required: MI JIW License, MUST drug test within 30 days, Background Check
Moore Electrical - Daybook
(2 JIW); Gun Lake Casino
Req. Date: 4/18/24; Start Date: 4/22/24; M-F 6AM-4:30PM, OT for several weeks, subject to change*
Required: MI Journeyman License, MUST Drug Test, Background Check
Bring 2 forms of ID, DL & SS/Birth Cert/Passport
Centennial Electric - (2) Daybook
(2 JIW)
Req. Date: 4/17/24; Start Date: 4/22/24; 7:00AM - 3:00PM;
Gun Lake Casino; Duration: 1 Month
MI JIW License
Centennial Electric #14
(1 JIW) Req. Date: 4/10/24; Start Date: 4/15/24; 7:00AM - 3:00PM;
Gun Lake Casino; Duration: End of Year
MI JIW License
Moore Electrical - Book II
(1 JIW); Pfizer - Various
Req. Date: 3/15; Start Date: 3/19; 6:00AM - 2:30PM; Indefinite
Required: MI JIW License, MUST drug test within 30 days, Background Check
Moore Electrical - Daybook
(5 JIW - Increased Call 3/19); Gun Lake Casino
Req. Date: 2/27/24; Start Date: 3/4/24; M-F 6AM-2:30PM, Possible OT; Indefinite
Required: MI Journeyman License, MUST Drug Test, Background Check
Bring 2 forms of ID, DL & SS/Birth Cert/Passport
Gurtz Electric -
(1 JIW), Pfizer MAPS
Start 4/5/24 7AM-3:30PM, M-F
Michigan State Journey License and Onsite Drug Testing required, OSHA 10, must work full schedule
Moore Electrical - Bk I #10, #12
(2 JIW); Zoetis B248 - Various
Updated: 3/21; Start Date: 3/21; (5x10's) 6:00AM - 4:30PM Mon - Fri; Indefinite
MI JIW License, MUST drug test within 60 days, Background Check
Moore Electric - Daybook
(2 JIW), Zoetis Portage Site
Start Date: 2/15/24; (Four 10s) 6:00AM - 4:30PM; Indefinite
MI State License, Background Check; Drug Test
Moore Electrical - Daybook
(1 JIW); Gun Lake Casino
Start Date: 2/14/24; M-F 6AM-2:30PM; Indefinite
Required: MI State J-man License, Drug Test, Background Check
Bring 2 forms of ID, DL & SS/Birth Cert/Passport
Champion Specialty Services - Daybook
Please Note: This is a National Labor Agreement Contract. Click here for details
Requested 2/5/24, (2 JIW), Palisades Nuclear Facility
Report: 2/7/24, 6:30AM to 5:00PM, M-T 10 hours, Friday OT when necessary,
Background check up to 2 weeks before start
Contractor Drug Testing, Background Check, Masks Required, NMAP
Moore Electric - Canceled Call
(2 JIW), Pfizer
Start Date: 1/25/2024; 6:00AM - 2:30PM; Indefinite
MI State License, Background Check; Drug Test
Moore Electrical - #17, #2, & (2) Daybook
(4 JIW); Gun Lake Casino
Start Date: 1/9/24; M-F 6AM-2:30PM; Indefinite
Required: MI State J-man License, Drug Test, Background Check
Bring 2 forms of ID, DL & SS/Birth Cert/Passport
ICC Electric - #9, CE
(2 JIW) - FlavorSum Kalamazoo
Start Date: 1/25/24, (Four 10's) 7AM
Applicant must have 2 forms of ID
Flemington Instrumentation - (1) Book 2
(cancelled); Pfizer MAPS; Portage
Start Date: 1/15; 4-6 Week Call
58 hrs/week, 7:00am - 5:30pm M-F & 7:00am - 3:30pm Saturdays; OT not guaranteed
Onsite Drug Test, Nonsmoking site, No smoking in parking lots; OSHA 10 or 30.
Please bring Driver's License, SS Card, and OSHA Card.
Moore Electric - Daybook
(2 JIW), Zoetis Portage Site,
Start Date: 1/8/2024; (Four 10s) 6:00AM - 4:30PM; Indefinite
MI State License, Background Check; Drug Test
Hi-Tech Electric -
(1) CE, Various Locations
Start Date: 1/25/24, 7AM to 3:30PM, Indefinite
Michigan State License Required, MUST drug test, Driver's License, SS Card
Hi-Tech Electric - # 17, (3) Daybook, (1) Book II
(5 JIW), Pfizer Portage Site
Start: 9/14/23, 7AM - 3:30PM, Indefinite
Moore Electric - 17
(1) JIW, Zoetis Downtown Site,
Start Date: 1/8/2024; 7:00AM - 3:30PM; Indefinite
MI State License, Background Check; Drug Test
Champion Specialty Services - Daybook
Please Note: This is a National Labor Agreement Contract. Click here for details
Requested 11/13/23, (filled) JIW, Palisades Nuclear Facility
Start 1/2/23*, 6:30AM, M-T 10 hours, Friday OT when necessary
Contractor Drug Testing, Background Check, Masks Required
Riverway Electric - Bk I #24
Requested Date: 12/21/2023 - 1 JIW; Fresh Thyme on Westnedge in Portage
Start Date: 1/15/2024; 10:00PM-6:30AM; 4-5 Nights
Converting Fluorescent Lighting to LEDS
Michigan State JIW License Required; Must bring ID & SS card for new hire paperwork.
KEI Electric - Daybook, (2) Book II
(5 filled) JIW, Multiple Locations
Start Date: 10/9/23, 7:00AM - 3:30PM; Indefinite
SS and Drivers Licensed Required
Moore Electrical -
(1) CE, Shop
Start Date: 12/4/2023; 1st Shift; Indefinite
MI State License, Background Check; Drug Test
Martell Electric - #22
Requested 10/23/23, (1) JIW, Woods Lake Elementary
Start 10/24/23; 6AM to 2:30PM, M-F
Current MUST Drug Test required, ID/SS# required
KEI ECM
(1) VDV Tech
Start Date: 10/11/2023; 7:00AM - 3:30PM; Indefinite
Gurtz Electric - (1) Book II, (1) Daybook , Closed
(4 of 5 filled) JIW, Pfizer MAPS
Start 7/11/23 @6:30AM, Shift Hours M-F 7AM-5:30PM + Sat. 7AM-3:30PM
Michigan State Journey License and Onsite Drug Testing required, OSHA 10, must work full schedule
Flemington Instrumentation - (1,2, 2 x Day Book)
(4 of 4 filled) JIW; Pfizer MAPS; Portage
Start Date: 10/16; 6-Week Call
58 hrs/week, 7:00am - 5:30pm M-F & 7:00am - 3:30pm Saturdays, OT not guaranteed
Onsite Drug Test, Nonsmoking site, No smoking in parking lots; OSHA 10 or 30.
Michigan State License Required
Moore Electrical: Closed
(2) JIW; Gun Lake Casino
Start Date: 10/10/23; 7:00am; Indefinite
Required: MI State JIW License, Drug Test, Background Check
Bring 2 forms of ID, DL & SS/Birth Cert/Passport
Moore Electrical - Closed
(2) JIW, Pfizer Portage Site,
Start Date: 9/18/2023; 7:00AM - 3:30PM; Indefinite
MI State License, Background Check; Drug Test
Moore Electrical - Closed
(1 of 3 filled) JIW, Zoetis Downtown Site,
Start Date: 9/18/2023; 7:00AM - 3:30PM; Indefinite
MI State License, Background Check; Drug Test
Moore Electrical - Daybook, #18
(2 of 2 filled JIW), Gun Lake Casino; New Construction
Start Date: 9/26/2023; 6:00AM - 2:30PM; Indefinite
MI State License, Background Check; Drug Test
Moore Electrical - #23, 2x Book II
(3 of 3 JIW Filled), Gun Lake Casino; New Construction
Start Date: 9/18/2023; 6:00AM - 2:30PM; Indefinite
MI State License, Background Check; Drug Test
Shaum Electric - Day Book , Closed
(1 of 2 JIW Filled) JIW; Tek Modo; Three Rivers
Start: 6/20/2023; 7:00AM - 3:30PM M-F; 5-6 Months
Required: Michigan Journeyman Electrical License
Moore Electrical (Daybook) Closed
(2 of 3 filled) JIW, Various Location
Start Date: 8/21/2023; 7:00AM - 3:30PM; Indefinite
MI State License, Background Check; MUST Drug Test required
Flemington Instrumentation - #18, daybook x 3
(4 of 4 filled) JIW; Pfizer MAPS; Portage
Start Date: 7/24/23; 6-Month Call
58 hrs/week, 7:00am - 5:30pm M-F & 7:00am - 3:30pm Saturdays
MUST be willing to work all hours; Contractor drug test required.
Nonsmoking site, No smoking in parking lots; OSHA 10 or 30.
Michigan State License Required
Gurtz Electric - (5) Book 2's
(5 of 5 Filled) JIW, Pfizer MAPS
Start 6/19/23 @6:30AM, Shift Hours M-F 7AM-5:30PM + Sat. 7AM-3:30PM
Michigan State Journey License and Onsite Drug Testing required
Hi-Tech Electric - Daybook
(1) JIW, Service Truck, Various Locations
Start Date: 8/7/23, 7AM to 3:30PM, Indefinite
Michigan State License Required, MUST drug test, Background Check, and Personal ID
Moore Electrical (Daybook x 2)
(2) JIW, Gun Lake Casino; New Construction
Start Date: 8/15/2023; 6:00AM - 2:30PM; Indefinite
MI State License, Background Check; Drug Test
Block Electric - #22
(1) JIW, Meijer in Plainwell
Start Date: 8/7/23, (2nd Shift) 5:00PM Start, 4/10s M-T, 8 week duration
2 forms of ID and Information for Direct Deposit required
Nitro Electric - #21
(1 of 2 filled) JIW, Vicksburg High School
Start Date: 6/12/23, 7AM-3:30PM
Michigan State Journeyman License, Background Check, Personal ID required
Hi-Tech Electric - Cancelled
(0 of 1 Filled) JIW, American Axle, Maintenance, Three Rivers
Start Date: 6/6/2023; 6:00AM - 2:00PM
Michigan State JIW License, Personal ID
Hi-Tech Electric - Cancelled
(0 of 1 Filled) JIW, American Axle, Maintenance, Three Rivers
Start Date: 6/6/2023; 2:00PM - 10:00PM
Michigan State JIW License, Personal ID
Hi-Tech Electric _Daybook
(Filled) JIW, AAM Maintenance - Three Rivers
Start: 6/6/2023 @ 10:00PM (10PM - 6AM); Indefinite Call
MI State JIW License, Current MUST Drug Test; Experience in troubleshooting industrial equipment is a plus.
Martell Electric - #23
(1) JIW, Loy Norrix HS
Start Date: 7/21/23, 50 hrs, 6AM - 4:30PM M-F, Summer
Current MUST Drug Test Required
Martell Electric -
(2 of 2 filled) JIW, Loy Norrix HS
Start Date: 7/27/23, 50 hrs, 6AM - 4:30PM M-F, (Edit) Short Call 2-weeks
Current MUST Drug Test Required
Martell Electric:
(2 of 2 filled) JIW, Gull Lake Middle School
Start Date: 7/25/23, 50 hrs, 6AM - 4:30PM M-F, Summer
Current MUST Drug Test Required
Hi-Tech Electric - Daybook
(1) JIW, Service Truck, Various Locations
Start Date: 7/17/23, 7AM to 3:30PM, Indefinite
Michigan State License Required, MUST drug test, Background Check, and Personal ID
Newkirk Electric: (Cancelled)
(0 of 1 Filled) JIW, Covert Generating Plant
Start 6/14/23, (4) 10's, 7AM to 5:30PM Mon - Thurs; 2 Months
MI State Journeyman License, current MUST Drug Test, and Background Check Required
Flemington Instrumentation (3x Day Book)
(0 of 3 open) JIW; Pfizer MAPS; Portage
Start Date: 6/27/2023; 7:00am - 5:30pm M-F & 7:00am - 3:30pm Saturdays
MUST be willing to work all hours; Contractor drug test required.
Nonsmoking site, No smoking in parking lots; OSHA 10 or 30.
Martell Electric: Daybook
(1) JIW, Gull Lake Middle School
Start Date: 7/17/23, 6AM - 4:30PM M-F, Summer
Current MUST Drug Test Required
Moore Electrical - #25, #26, (2) daybook
(0 of 4 open) JIW, Zoetis
Start 7/17/23, 7AM to 3:30PM, Indefinite
MI State License, Background Check, Drug Test, 2 forms of ID required
Block Electric #19
(1) JIW, Meijer in Plainwell
Start Date: 7/10/23, (2nd Shift) 6:00PM Start, 4/10s
2 forms of ID and Information for Direct Deposit required
Martell Electric
(1) JIW, Loy Norrix HS
Start Date: 6/27/26, 6AM - 4:30PM M-F, 2 month duration
Current MUST Drug Test Required
KEI Electric: #21, Day Book
(0 of 2 open) JIW, Graphic Packaging Inc
Start 6/15/23, 7AM-3:30PM, Mon - Friday
Michigan State Journeyman License required.
Martell Electric - #4
(1) Service Truck Driver
Start Date: 7/17/23, 7:00-3:30PM M-F, Indefinite
Current MUST Drug Test Required, Michigan State Electrical License, Driver's License
Hi-Tech Electric - Daybook
(1) JIW, Service Truck
Start Date: 6/12/23, 7AM to 3:30PM, Indefinite
Michigan State License Required, MUST drug test, Background Check, and Personal ID
Climax Construction- Book II
(1) JIW; Various Locations; Residential Solar Installations
Start Date: ASAP; 8-12 Hour Shifts, Starting at 6:00AM (M-F & Occasional Saturdays)
Michigan State License Required
Martell Electric - #2
(1) JIW; KPS Wood Lake Elementary - Commercial Electrical
Start Date: 6/12/23; 7:00 AM- 3:30 PM; 3-4 Month Call
MUST Drug Test (Within 30 Days)
Martell Electric
(1) JIW; Gull Lake Middle School - Lighting & Lighting Controls
Start Date: 6/12/2023; 7:00 AM - 3:30 PM; Approximately 3 Month Call
MUST Drug Test (Within 30 Days)
Hi-Tech Electric - Call Canceled
(0 of 1 Filled) JIW, AAM Maintenance - Three Rivers
Start: 6/6/2023 @ 10:00PM (10PM - 6AM); Indefinite Call
MI State JIW License, Current MUST Drug Test; Experience in troubleshooting industrial equipment is a plus.
Moore Electrical - #27
(1) JIW, Shop - Various Locations
Start 6/7/23, 7AM to 3:30PM, Indefinite
MI State License, Background Check, Drug Test, 2 forms of ID required
Moore Electrical - #28
(1) JIW, Shop - Various Locations
Start 6/7/23, 7AM to 3:30PM, Indefinite
MI State License, Background Check, Drug Test, 2 forms of ID required.
Shaum Electric - #1, Day Book
(2) JIW, Tek Modo, Three Rivers
Start: 6/6/23 @ 7:00AM; 4-6 months
Michigan State License Required
Flemington Instrument (5/25) : #1, #11
2 JIW, Pfizer, Portage
Starts Wednesday, May 31st at 6:30AM; 7AM - 5:30 M-F; 7AM - 3:30PM Saturdays
MUST be willing to work all hours; Contractor drug test required.
Nonsmoking site, 3 story building; lots of walking up and down stairs; OSHA 10 or 30 card needed.
Moore Electric - #7, #29, #11
(3) JIW, Shop - Various Locations
Start 5/30/23, 7AM to 3:30PM, Indefinite
MI State License, Background Check, MUST Drug Test, 2 forms of ID required
Hi-Tech Electric - Call Cancelled
(1) JIW, AAM Maintenance
Start: 5/24/23, 10PM - 6AM, 3 Night Call
Michigan State License Required, MUST drug test, and Personal ID
Hi-Tech Electric - Call Cancelled
(1) JIW, AAM Maintenance
Start: 5/24/23, 10PM - 6AM, 8 night Call through June 8th
Michigan State License Required, MUST drug test, and Personal ID
Hi-Tech Electric - #19
(1) JIW, Various Locations - Service Maintenance
Start: 5/23/23, 6:00AM-2:30PM Shift
Michigan State License Required, MUST drug test, Background Check, and Personal ID
Gen3 Electric - #29, #30
(2) JIW's, Pfizer MAPS
Start 5/19/23, 7am-330PM
On-site Contractor Drug Testing, OSHA 10/30, NO SMOKING During Shift
Hi-Tech Electric -
(1) CE, Various Locations
Start: 5/22/23, 7:00AM-3:30PM Shift
Michigan State License Required
Moore Electrical - #5
(1) JIW - Justice Facility
Start: May 22nd; 40 Hour Call; Indefinite
Background Check, Drug Testing, MI Journeyman License Required
Flemington Instrument: (2) Bk IIs
(2) JIW, Pfizer, Portage
Starts Tuesday, May 16th at 6:30AM; 7AM - 5:30 M-F; 7AM - 3:30PM Saturdays
MUST be willing to work all hours; Contractor drug test required.
Nonsmoking site, 3 story building; lots of walking up and down stairs; OSHA 10 or 30 card needed.
Hi-Tech Electric - #27
(1) JIW, American Axle, Three Rivers
Start: Monday, May 15th; 2nd Shift: 2PM-10:30PM (12 1/2% Shift Premium)
Michigan State License Required
Flemington Instrument - #2 & #25
(2) JIW, Pfizer, Portage
Start: 5/08/2023 @ 6:30AM; 5-10's; Duration: 6 Months
On-site Contractor Drug Testing, OSHA 10/30, NO SMOKING During Shift
Moore Electrical - Day Book
(1) VDV Tech, Various Locations
Start: April 24th; 40 Hour Call; Indefinite
Background Check & Drug Testing Required
Climax Solar - Bk 2
() JIW, Various Locations
Start: Monday April 24th; M-F 6AM-2:30PM, OT Available; Indefinite Call
MI State JIW License Required; Residential Experience Preferred
Flemington Instrument -#22
(1) JIW, Pfizer, Portage
Start: 4/19/2023 @ 6:30AM; 5-10's; Duration: 3 Months
On-site Contractor Drug Testing
Shaum Electric - #13 & CE
(Filled) JIW, Tek Modo, Three Rivers
Start: 4/13/2023 @ 7:00AM; Duration TBD
Michigan State License Required
Hi-Tech Electric - #24 & (2) Book 2's
(3) JIW, Pfizer Portage Facility
Start: Wed. 4/12/23, 7AM - 3:30PM, One Month Call
Required: MI State License, MUST Drug Test in last 30 days, Background Check, and
Covid Vaccination required.
Moore Electric -
(1) CE - Shop
Start - Tuesday April 4th, 7:00AM Start
MUST Drug Test, Background Check, State License, Valid Drivers License
Shaum Electric - #13, #21, (1) Bk II
(3) JIW, Tek Modo, Three Rivers
Start 4/3/2023 @ 7:00AM; Duration 1+ Month Call
Michigan State JIW License Required
FE Moran - #9 & (2) Book 2's
(3) JIW, Pfizer Portage Site
Start 3/27/2023 @ 6AM, Schedule - 4-10's & OT Possible, subject to change - 3-4 Month Call
Onsite Drug Testing
Flemington Instrument - #1 & #7
(2) JIW, Pfizer Portage Site
Start 3/27/23 @ 7AM, Schedule - 5-10's & 8 on Sat. - 5 Month Call
Onsite Drug Testing & Driver's License Required, Must be willing to work OT
Moore Electric -
(1) CE - Shop
Start - Wednesday March 22, 2023
Hi-Tech Electric
(2) CEs, Outside, Inside, Commerical, Residential, Service Work, Various Location
Start: Monday, March 30, 2023; Indefinite Call
MI State License, Background Check, Contractor Drug Test
FE Moran - (2) Book 2's
(2) JIW, Pfizer MAPS Project, Fire Alarm
Start 3/1/23, 6:00AM Start, Four Tens-Schedule for 4-5 months, Possible OT
Michigan State Journey License, On-site Drug Testing, 2 forms of ID required
Hi-Tech Electric - #18
(1) JIW, Pfizer Portage Facility
Start: Monday 2/20/23, 7AM - 3:30PM, One Month Call
Required: MI State License, MUST Drug Test in last 30 days, Background Check, and
Covid Vaccination required.
Hi-Tech Electric - Filled by CE
(1) CE, Commercial Work, Various Locations
Start: Monday, 2/20/2023, Indefinite Call
Required: MI State License, MUST Drug Test, Background Check, COVID-19 Vaccination
Climax Solar - #19 & Book 2
(2) JIW, Residential Solar Work, Various Locations
Start: 2/13/23 @ 6:00AM M-F, Indefinite Call
MI State License Required, Long Hours, Shift Length Varies
Flemington Instrument (#8)
(1) JIW, Pfizer Portage Site
Start: 2/14/23 @ 6:45AM, 6 Month Call, OT Available
Michigan State Journeyman Licenses, 2 forms of ID, Online Orientation to be completed Friday by 3PM for Tuesday Start
Flemington Instrument - (#1 & #17)
(2) JIW, Pfizer Portage Site
Start: 2/6/23 @ 6:45AM, 5-6 Month Call, OT Available
Michigan State Journeyman Licenses & 2 forms of ID
Schwartz Electric - (#5)
(1) JIW, Heartland RV (new construction), Sturgis MI
Start 1/30/23, 7AM to 3:30PM, M-F, Indefinite
Michigan State Journeyman License & 2 forms of ID Required
FE Moran (Book 1 - #1, #3)
(2) JIW, Pfizer MAPS Project, Fire Alarm
Start 1/30/23 *corrected*, 6:30AM Start, Four Tens-Schedule for 4-5 months
Michigan State Journey License, On-site Drug Testing, 2 forms of ID required
Moore Electric - Book 1 (#1 & #27), (1) Book 2
(0 of 3 open) JIW, Pfizer Shutdown Work, Portage
Start 1/25/23, 7AM to 3:30PM, OT during 3-week shutdown beginning 2/22/23
MI State License, Background Check, MUST Drug Test within 30 days before reporting to work,
COVID-19 Vaccination Required
Paperwork & orientation must be completed by noon Friday to report Monday
Moore Electric Filled Book II
(2) JIW, Pfizer Portage Site
Start 1/23/23, 7AM Start, 10 hours Monday thru Friday, 8 Hours Sat.
MI State License, MUST Drug Test within 30 days before reporting to work, COVID-19 Vaccination,
Paperwork & orientation must be completed by noon Friday to report Monday
Hi-Tech Electric
(1) CE, Various Locations
Start 1/23/23, 7AM to 3:30PM
MI State License Required
Moore Electric - #21, #23, (2) Book 2
(4 of 4 filled) JIW, Pfizer Shutdown Work, Portage
Start 1/16/23, 7AM to 3:30PM, OT during 3-week shutdown beginning 2/22/23
MI State License, MUST Drug Test within 30 days before reporting to work, COVID-19 Vaccination,
Paperwork & orientation must be completed by noon Friday to report Monday
Nitro Electric - Book 2
(1) JIW, Aldis, Sturgis Michigan
Start 1/9/23, 7AM to 3:30PM, 2 weeks
Michigan State Electrical License Required
KEI Electric - 2 Book 1
(2) JIW, Various Locations
Start 1/5/23, 40 hrs 7AM-3:30, Indefinite
Current MUST Drug Test required
Schwartz Electric
(1) JIW, Heartland RV, Sturgis MI
Start 12/27/22, 7AM to 3:30PM, Indefinite
Michigan State License and 2 forms of ID Required
Climax Construction
(1) CE, Residential Solar, various locations
Start 12/23/22, 6AM Start, Indefinite Call
Current MUST Drug Test and Background Check Required
Moore Electric - filled by #38, 36, & (2 Book 2's)
(1 of 4 open) JIW, Pfizer Portage Site
Start 12/19/22, Indefinite, 7AM to 3:30 PM 40 hours-a-week
Full Covid-19 Vaccination Required, Must Drug Test last 30 days before reporting to site, 2-3 day background check before reporting to site, Masks required on site
Climax Construction
(1) CE, Residential Solar, various locations
Start 12/13/22, 6AM Start, Indefinite Call
Current MUST Drug Test and Background Check Required
Hi-Tech Electric
(1) CE, Service Truck
Start 12/12/22, 1st Shift
Michigan State License Required
IBID County Electric Book I #8, #22, #34, #39, #40 Book II #8
(6) JIW, Welch Foods Inc, Lawton MI
Start 11/22/22, 6AM to 4:30PM, 7 Days a Week for 2 Months
Michigan State License and Masks are required on site
IBID County Electric - Filled by (4) Book 2's (daybook)
(0 of 4 open) JIW, Welch Foods Inc, Lawton MI
Start 11/16/22, 6AM to 4:30PM, 7 Days a Week for 2 Months
Michigan State License and Masks are required on site
Shaum Electric - Filled by Book I #36 & day book, (3) Book 2,
(0 of 5 Open) JIW Tekmodo Moldings, Three Rivers
Start 11/07/22, 7AM to 3:30PM, 5 Month Call
Michigan State Journey License Required
Moore Electrical (Filled by # 1, #39, 2 Book 2's)
(4) JIW, Pfizer
Starting Monday, October 31st; 7:00am-3:30pm
Required: MUST Drug Test (within 60 days), MI State License, Background Check (2-3 days), COVID Vaccination
Climax Solar -
CE, Commercial/Residential Solar Work
Start 9/27 at 6:00am with Regular OT
Michigan State License Required.
IBID County Electric -
(1) CE, Welch's, Paw Paw; Existing Food Processing Facility, New Equipment
Start November 7th; Duration 2-3 Months
4 x 10's, OT Fridays & Saturdays, Working some Sundays, 6 AM Start
Required: MI State License, Masks, Safety Toed Shoes & Glasses
IBID County Electric - Filled by #3, #4 & Book 2
(3) JIW, Welch's, Paw Paw; Existing Food Processing Facility, New Equipment
Start November 2nd; Duration 2-3 Months
4 x 10's, OT Fridays & Saturdays, Working some Sundays
Required: MI State License, Masks, Safety Toed Shoes & Glasses
IBID County Electric - Filled by #39 & 40, Book 2
(3) JIW, Welch's, Paw Paw; Existing Food Processing Facility, New Equipment
Start October 26th; Duration 2-3 Months
4 x 10's (Mon-Thurs); OT on Fri, Sat, and Some Sundays
Required: MI State License, Masks, Safety Toed Shoes & Safety Glasses
J-Ranck - Filled by #10
(1) JIW, Various Location, Pump Stations
Start 10/24/22, 7AM-5:30PM, 4-10 Sched.
2 Forms of ID Required
Shaum Electric - Filled by Book I # 10 & 31
(2) JIW Tekmodo Moldings, Three Rivers
Start 10/17/22, 7AM to 3:30PM, 6 Month Call
Michigan State Journey License Required
Climax Solar - Filled by #42
(1) JIW, Residential/Service Solar Work
Start 10/10/22, 6AM start with regular OT
Michigan State License Required
Moore Electric
(1) CE3, Zoetis Farms, Kalamazoo
Start 10/5/22, 7AM to 3:30PM, Indefinite
Must Drug Test and Background Check require
IBID County Electric - Filled by Book 1 #1
(1) JIW, Welch's, Paw Paw
4x10's with OT on Friday & Saturday; 2-3 Month Call.
Michigan state license, safety glasses, hardhat, steel toed shoes, and masks are all required.
Lakeland Electrical - (2) Book 2 #36 & (1) Book 1 Daybook
(0 of 3 Open) JIW, Pfizer MAPS, Portage
Start Monday, October 3rd. Long Call. 7:00AM-3:30PM M-F; OT When Necessary
Onsite & Random drug testing; Background Check Required
No COVID vaccination or mask mandate required.
Ibid County Electric - (Filled by Book 2)
(1) JIW, Welch's in Lawton, MI
Start 9/29/22, hours 6AM to 4:30 PM, 4/10's with OT on Friday and Saturday
MI State Journeyman Electrical License, Masks, and PPE required.
Moore Electric (Book I #13, Book I Day Book, Book II - Day Book x 2)
(0 of 4 open) JIW, Zoetis (Various Locales),
Start 9/29/22, OVERTIME; 6AM to 3:30 PM M-F
MUST Drug test within 30 days of Hire, Background Check required
Moore Electric - Filled by #42
(2) JIW, Pfizer Portage Site
Start 9/28/22, 7 AM to 3:30 PM, M-F
Current Must drug test (within 30 days of hire), Background Check, Covid-19 Vaccination,
and Masks are required
Lakeland Electric (Book I #43, #43)
(2) JIW, Pfizer Maps, Kalamazoo
Start Monday, September 26, Long Call, 7:00AM to 3:30PM, OT When Necessary
Onsite & Random Drug Testing, Background Check Required.
No COVID Vaccines or Masks Needed
Moore Electrical - Filled by Book 1 #39
(1) JIW, Zoetis, Kalamazoo
Start 9/12, Long Call, 7:00AM to 3:30PM
Current MUST Drug Test, Background Check, and MI State License Required
Schwartz Electric -Filled by Book1 #44, #42
(2) JIW, Sturgis Michigan, New Industrial Build
Start 9/9, Long Call, 7AM to 3:30PM
Current Must Drug Test and MI State Journeyman License Required
Lakeland Electric - Filled by (2) Book 1 #32 & #44 and (2) Book 2
(4) JIW, Pfizer MAPS Project, New build pharmaceutical facility
Start, Long Call 6+ Months, 7:00AM to 3:30PM, OT as needed
On-Site Drug Testing Required, may be subject to random testing. Background Check required.
No Covid-19 Vaccine requirement.
KEI Electric - Filled by (3) Book 1: #40, #47, #41 & (4) Book 2
(7) JIW, Day Shift for Graphic Packaging Annual Shutdown
Report 9/9 for paperwork. Shutdown is 4 days, 9/12 to 9/15.
First Shift, 12 hours, 6AM-6PM
KEI Electric - Filled by (1) Book 1: #39 & (4) Book 2's
(5) JIW, Night Shift for Graphic Packaging Annual Shutdown
Report 9/9 for paperwork. Shutdown is 3 nights minimum, 9/12 to 9/14.
Night Shift, 12 hour, 6PM-6AM, All hours paid @ OT (1.5x)
Lakeland Electric
No JIW Call at this time, previous call due to request error
Brite Electric
(1) JIW, Drive and Shine (S Westnedge), Kalamazoo
Start 8/31/22, 7AM to 3:30 PM, 8 to 12 weeks
Michigan State Journeyman License is required
Hi Tech Electric
(1) CE, Commercial and Industrial
Start 8/25/2022, Indefinite
Climax Solar
(1) CE for Residential Solar Work
Start 8/29/22, 6AM
IBID County Electric
(1) JIW, Welch's Foods (Lawton, MI)
Start, 8/23, 4-10s, Mon-Thurs, likely Friday (OT) as well. 6:00AM to 4:30PM
MI State License Required
Lakeland Electric
(2) JIW, Pfizer MAPS Project
Start 8/23/22, 12-24 month Call, 7:00AM to 3:30PM
On-Site Drug Testing Required, may be subject to random testing. Background Check required. (Edit) No Covid-19 Vaccine requirement.
Climax Solar
(1) CE, Residential Solar Service
Start: 8/15/22
MI State License Required
Shaum Electric
(1) JIW, New Construction, Three Rivers, MI
Start:8/10/22, Duration: 6-8 Months, M-F 7AM-3:30PM
MI State License, Lift certification Required, 2-forms of ID required for Hiring Papers
Moore Electric
(2) JIW, Pfizer-Portage - (1) Cancelled
Start 08/9/22, Indefinite call 7:00AM to 3:30PM
Drug Test within last 30 Days, MI Lic. Journeyman, Background Check, Cov-19 Vaccine, Masks
Required onsite
Martell Electric
(1) JIW, Gull Lake Middle School
Start 8/8, Short Call 1-2 weeks
4-10 Schedule
Drug Test Required within 30 days of start
Climax Solar
(1) JIW, Residential Solar Work
Start 8/3, Long Term/Indefinite Call
6:00AM to 5:00PM, Regularly available OT. Some Mondays Off
MI Journeyman License Required
Moore Electrical
(1) JIW, Pfizer - Misc.
Report to Moore Shop on 8/3/22
40+ hrs - Occasional OT as needed
Drug Test within last 30 days, Background Check, Covid-19 Vaccine, and Masks required