Welcome to the IBEW Local 131 Website!

IBEW Local 131 Job Information Page



Book 1: 27

Book 2: 2


 Click Here for Book 1 and Book 2 Referral and Resign Information 

BOOK 2 SIGNS ARE TO BE DONE BY FAX FROM HOME LOCAL


TO BID ON A NEW CALL:

You must leave a message on the Job Line between 5:00 P.M. and 8:00 A.M.

Anyone ineligible for a call due to vaccine status or background check must call the jobline each call to prevent a strike/ding

(269) 382-1762

TO ACCEPT AN OPEN CALL:

Please call the Hall during normal business hours.

(8:00 A.M. to 4:30 P.M.)



New Call      Open Call      Closed Call 

Click here for Michigan State Licensing Information 


Click here JIW Wage Sheet


   KEI Electric - Daybook, 2xBook II

(3 0f 5 filled) JIW, Multiple Locations 

Start Date: 10/9/23, 7:00AM - 3:30PM; Indefinite

SS and Drivers Licensed Required  


   Hi-Tech Electric -

          (0 of 5 filled) JIW, Pfizer Portage Site

          Start: 9/14/23, 7AM - 3:30PM, Indefinite


   Hi-Tech Electric - #28

          (3 of 4 Filled) JIW, Abbott Labs, Sturgis

          Start: 6/6/23, 7AM - 3:30PM, 4-6 Months 

          Michigan State License Required, MUST drug test, Background Check, and Personal ID

          FDA regulated jobsite, lab coats, hair nets, and captive boots are required/provided 


   Moore Electrical - 

(1) CE, Shop

Start Date: 12/4/2023; 1st Shift; Indefinite

MI State License, Background Check; Drug Test


 Champion Specialty Services -  

         Please Note: This is a National Labor Agreement Contract. Click here for details 

         Requested 11/13/23, (2of 2 filled) JIW, Palisades Nuclear Facility

         Start 11/27/23, 6:30AM, M-T 10 hours, Friday OT when necessary

         Contractor Drug Testing, Background Check, Masks Required 


  Martell Electric - #22

         Requested 10/23/23, (1) JIW, Woods Lake Elementary

         Start 10/24/23; 6AM to 2:30PM, M-F

         Current MUST Drug Test required, ID/SS# required


  KEI ECM

(1) VDV Tech

Start Date: 10/11/2023; 7:00AM - 3:30PM; Indefinite


  Gurtz Electric - (1) Book II, (1) Daybook , Closed

          (4 of 5 filled) JIW, Pfizer MAPS

          Start 7/11/23 @6:30AM, Shift Hours M-F 7AM-5:30PM + Sat. 7AM-3:30PM

          Michigan State Journey License and Onsite Drug Testing required, OSHA 10, must work full schedule


  Flemington Instrumentation -  (1,2, 2 x Day Book)

(4 of 4 filled) JIW; Pfizer MAPS; Portage

Start Date: 10/16; 6-Week Call

58 hrs/week, 7:00am - 5:30pm M-F & 7:00am - 3:30pm Saturdays, OT not guaranteed

Onsite Drug Test, Nonsmoking site, No smoking in parking lots; OSHA 10 or 30.

Michigan State License Required


  Moore Electrical:  Closed

(2) JIW; Gun Lake Casino

Start Date: 10/10/23; 7:00am; Indefinite

Required: MI State JIW License, Drug Test, Background Check

Bring 2 forms of ID, DL & SS/Birth Cert/Passport


  Moore Electrical -  Closed

(2) JIW, Pfizer Portage Site, 

Start Date: 9/18/2023; 7:00AM - 3:30PM; Indefinite

MI State License, Background Check; Drug Test


  Moore Electrical -  Closed

(1 of 3 filled) JIW, Zoetis Downtown Site, 

Start Date: 9/18/2023; 7:00AM - 3:30PM; Indefinite

MI State License, Background Check; Drug Test


  Moore Electrical - Daybook, #18

(2 of 2 filled JIW), Gun Lake Casino; New Construction

Start Date: 9/26/2023; 6:00AM - 2:30PM; Indefinite

MI State License, Background Check; Drug Test


  Moore Electrical - #23, 2x Book II

(3 of 3 JIW Filled), Gun Lake Casino; New Construction

Start Date: 9/18/2023; 6:00AM - 2:30PM; Indefinite

MI State License, Background Check; Drug Test


  Shaum Electric - Day Book , Closed

(1 of 2 JIW Filled) JIW; Tek Modo; Three Rivers

Start: 6/20/2023; 7:00AM - 3:30PM M-F; 5-6 Months

Required: Michigan Journeyman Electrical License


  Moore Electrical (Daybook) Closed

(2 of 3 filled) JIW, Various Location

Start Date: 8/21/2023; 7:00AM - 3:30PM; Indefinite

MI State License, Background Check; MUST Drug Test required


  Flemington Instrumentation -  #18, daybook x 3

(4 of 4 filled) JIW; Pfizer MAPS; Portage

Start Date: 7/24/23; 6-Month Call

58 hrs/week, 7:00am - 5:30pm M-F & 7:00am - 3:30pm Saturdays

MUST be willing to work all hours; Contractor drug test required.

Nonsmoking site, No smoking in parking lots; OSHA 10 or 30.

Michigan State License Required


  Gurtz Electric - (5) Book 2's

          (5 of 5 Filled) JIW, Pfizer MAPS

          Start 6/19/23 @6:30AM, Shift Hours M-F 7AM-5:30PM + Sat. 7AM-3:30PM

          Michigan State Journey License and Onsite Drug Testing required


   Hi-Tech Electric - Daybook

(1) JIW, Service Truck, Various Locations

Start Date: 8/7/23, 7AM to 3:30PM, Indefinite

Michigan State License Required, MUST drug test, Background Check, and Personal ID


  Moore Electrical  (Daybook x 2) 

(2) JIW, Gun Lake Casino; New Construction

Start Date: 8/15/2023; 6:00AM - 2:30PM; Indefinite

MI State License, Background Check; Drug Test


  Block Electric - #22

          (1) JIW, Meijer in Plainwell

          Start Date: 8/7/23, (2nd Shift) 5:00PM Start, 4/10s M-T, 8 week duration

          2 forms of ID and Information for Direct Deposit required 


  Nitro Electric - #21

(1 of 2 filled) JIW, Vicksburg High School

Start Date: 6/12/23, 7AM-3:30PM

Michigan State Journeyman License, Background Check, Personal ID required  


  Hi-Tech Electric - Cancelled

(0 of 1 Filled) JIW, American Axle, Maintenance, Three Rivers

Start Date: 6/6/2023; 6:00AM - 2:00PM

Michigan State JIW License, Personal ID  


  Hi-Tech Electric - Cancelled

(0 of 1 Filled) JIW, American Axle, Maintenance, Three Rivers

Start Date: 6/6/2023; 2:00PM - 10:00PM

Michigan State JIW License, Personal ID


  Hi-Tech Electric _Daybook

(Filled) JIW, AAM Maintenance - Three Rivers

Start: 6/6/2023 @ 10:00PM (10PM - 6AM); Indefinite Call

MI State JIW License, Current MUST Drug Test; Experience in troubleshooting industrial equipment is a plus.


  Martell Electric - #23

          (1) JIW, Loy Norrix HS

          Start Date: 7/21/23, 50 hrs, 6AM - 4:30PM M-F, Summer

          Current MUST Drug Test Required


  Martell Electric 

          (2 of 2 filled) JIW, Loy Norrix HS

          Start Date: 7/27/23, 50 hrs, 6AM - 4:30PM M-F, (Edit) Short Call 2-weeks

          Current MUST Drug Test Required


  Martell Electric:

          (2 of 2 filled) JIW, Gull Lake Middle School

          Start Date: 7/25/23, 50 hrs, 6AM - 4:30PM M-F, Summer

          Current MUST Drug Test Required


  Hi-Tech Electric - Daybook

(1) JIW, Service Truck, Various Locations

Start Date: 7/17/23, 7AM to 3:30PM, Indefinite

Michigan State License Required, MUST drug test, Background Check, and Personal ID


  Newkirk Electric: (Cancelled)

(0 of 1 Filled) JIW, Covert Generating Plant

Start 6/14/23, (4) 10's, 7AM to 5:30PM Mon - Thurs; 2 Months

MI State Journeyman License, current MUST Drug Test, and Background Check Required


  Flemington Instrumentation (3x Day Book)

(0 of 3 open) JIW; Pfizer MAPS; Portage

Start Date: 6/27/2023; 7:00am - 5:30pm M-F & 7:00am - 3:30pm Saturdays

MUST be willing to work all hours; Contractor drug test required.

Nonsmoking site, No smoking in parking lots; OSHA 10 or 30.


  Martell Electric: Daybook

          (1) JIW, Gull Lake Middle School

          Start Date: 7/17/23, 6AM - 4:30PM M-F, Summer

          Current MUST Drug Test Required


  Moore Electrical - #25, #26, (2) daybook

(0 of 4 open) JIW, Zoetis

Start 7/17/23, 7AM to 3:30PM, Indefinite

MI State License, Background Check, Drug Test, 2 forms of ID required


  Block Electric #19

          (1) JIW, Meijer in Plainwell

          Start Date: 7/10/23, (2nd Shift) 6:00PM Start, 4/10s

          2 forms of ID and Information for Direct Deposit required 


  Martell Electric

          (1) JIW, Loy Norrix HS

          Start Date: 6/27/26, 6AM - 4:30PM M-F, 2 month duration

          Current MUST Drug Test Required


  KEI Electric: #21, Day Book

(0 of 2 open) JIW, Graphic Packaging Inc

Start 6/15/23, 7AM-3:30PM, Mon - Friday

Michigan State Journeyman License required.


  Martell Electric - #4

          (1) Service Truck Driver 

          Start Date: 7/17/23, 7:00-3:30PM M-F, Indefinite

          Current MUST Drug Test Required, Michigan State Electrical License, Driver's License


   Hi-Tech Electric - Daybook

(1) JIW, Service Truck

Start Date: 6/12/23, 7AM to 3:30PM, Indefinite

Michigan State License Required, MUST drug test, Background Check, and Personal ID


  Climax Construction- Book II 

(1) JIW; Various Locations; Residential Solar Installations

Start Date: ASAP; 8-12 Hour Shifts, Starting at 6:00AM (M-F & Occasional Saturdays)

Michigan State License Required


  Martell Electric - #2

(1) JIW; KPS Wood Lake Elementary - Commercial Electrical

Start Date: 6/12/23; 7:00 AM- 3:30 PM; 3-4 Month Call

MUST Drug Test (Within 30 Days)


  Martell Electric

(1) JIW; Gull Lake Middle School - Lighting & Lighting Controls

Start Date: 6/12/2023; 7:00 AM - 3:30 PM; Approximately 3 Month Call

MUST Drug Test (Within 30 Days)


   Hi-Tech Electric - Call Canceled

(0 of 1 Filled) JIW, AAM Maintenance - Three Rivers

Start: 6/6/2023 @ 10:00PM (10PM - 6AM); Indefinite Call

MI State JIW License, Current MUST Drug Test; Experience in troubleshooting industrial equipment is a plus.


   Moore Electrical - #27

(1) JIW, Shop - Various Locations

Start 6/7/23, 7AM to 3:30PM, Indefinite

MI State License, Background Check, Drug Test, 2 forms of ID required


   Moore Electrical - #28

(1) JIW, Shop - Various Locations

Start 6/7/23, 7AM to 3:30PM, Indefinite

MI State License, Background Check, Drug Test, 2 forms of ID required.


   Shaum Electric - #1, Day Book

(2) JIW, Tek Modo, Three Rivers

Start: 6/6/23 @ 7:00AM; 4-6 months

Michigan State License Required


   Flemington Instrument (5/25) : #1, #11

2 JIW, Pfizer, Portage

Starts Wednesday, May 31st at 6:30AM; 7AM - 5:30 M-F; 7AM - 3:30PM Saturdays

MUST be willing to work all hours; Contractor drug test required. 

Nonsmoking site, 3 story building; lots of walking up and down stairs; OSHA 10 or 30 card needed.


   Moore Electric - #7, #29, #11

(3) JIW, Shop - Various Locations

Start 5/30/23, 7AM to 3:30PM, Indefinite

MI State License, Background Check, MUST Drug Test, 2 forms of ID required


   Hi-Tech Electric - Call Cancelled

(1) JIW, AAM Maintenance

Start: 5/24/23, 10PM - 6AM, 3 Night Call 

Michigan State License Required, MUST drug test, and Personal ID


   Hi-Tech Electric - Call Cancelled

(1) JIW, AAM Maintenance

Start: 5/24/23, 10PM - 6AM, 8 night Call through June 8th

Michigan State License Required, MUST drug test, and Personal ID


   Hi-Tech Electric - #19

(1) JIW, Various Locations - Service Maintenance  

Start: 5/23/23, 6:00AM-2:30PM Shift 

Michigan State License Required, MUST drug test, Background Check, and Personal ID


    Gen3 Electric - #29, #30

         (2) JIW's, Pfizer MAPS 

         Start 5/19/23, 7am-330PM

         On-site Contractor Drug Testing, OSHA 10/30, NO SMOKING During Shift


   Hi-Tech Electric - 

(1) CE, Various Locations

Start: 5/22/23, 7:00AM-3:30PM Shift 

Michigan State License Required


  Moore Electrical  - #5

(1) JIW - Justice Facility

Start: May 22nd; 40 Hour Call; Indefinite

Background Check, Drug Testing, MI Journeyman License Required


   Flemington Instrument: (2) Bk IIs

(2) JIW, Pfizer, Portage

Starts Tuesday, May 16th at 6:30AM; 7AM - 5:30 M-F; 7AM - 3:30PM Saturdays

MUST be willing to work all hours; Contractor drug test required. 

Nonsmoking site, 3 story building; lots of walking up and down stairs; OSHA 10 or 30 card needed.


   Hi-Tech Electric - #27

(1) JIW, American Axle, Three Rivers

Start: Monday, May 15th; 2nd Shift: 2PM-10:30PM (12 1/2% Shift Premium)

Michigan State License Required


   Flemington Instrument - #2 & #25

(2) JIW, Pfizer, Portage

Start: 5/08/2023 @ 6:30AM; 5-10's; Duration: 6 Months

On-site Contractor Drug Testing, OSHA 10/30, NO SMOKING During Shift


   Moore Electrical  - Day Book

(1) VDV Tech, Various Locations

Start: April 24th; 40 Hour Call; Indefinite

Background Check & Drug Testing Required


   Climax Solar - Bk 2

() JIW, Various Locations

Start: Monday April 24th; M-F 6AM-2:30PM, OT Available; Indefinite Call

MI State JIW License Required; Residential Experience Preferred


 Flemington Instrument -#22

(1) JIW, Pfizer, Portage

Start: 4/19/2023 @ 6:30AM; 5-10's; Duration: 3 Months

On-site Contractor Drug Testing 


 Shaum Electric - #13 & CE

(Filled) JIW, Tek Modo, Three Rivers

Start: 4/13/2023 @ 7:00AM; Duration TBD

Michigan State License Required


   Hi-Tech Electric - #24 & (2) Book 2's

(3) JIW, Pfizer Portage Facility

Start: Wed. 4/12/23, 7AM - 3:30PM, One Month Call

Required: MI State License, MUST Drug Test in last 30 days, Background Check, and

Covid Vaccination required.


   Moore Electric -

          (1) CE - Shop

          Start - Tuesday April 4th, 7:00AM Start 

          MUST Drug Test, Background Check, State License, Valid Drivers License


   Shaum Electric - #13, #21, (1) Bk II

(3) JIW, Tek Modo, Three Rivers

Start 4/3/2023 @ 7:00AM; Duration 1+ Month Call

Michigan State JIW License Required


   FE Moran - #9 & (2) Book 2's

(3) JIW, Pfizer Portage Site

Start 3/27/2023 @ 6AM, Schedule - 4-10's & OT Possible, subject to change - 3-4 Month Call

Onsite Drug Testing


   Flemington Instrument - #1 & #7

(2) JIW, Pfizer Portage Site

Start 3/27/23 @ 7AM, Schedule - 5-10's & 8 on Sat. - 5 Month Call

Onsite Drug Testing & Driver's License Required, Must be willing to work OT


   Moore Electric -

          (1) CE - Shop

          Start - Wednesday March 22, 2023


   Hi-Tech Electric

(2) CEs, Outside, Inside, Commerical, Residential, Service Work, Various Location

Start: Monday, March 30, 2023; Indefinite Call

MI State License, Background Check, Contractor Drug Test


   FE Moran - (2) Book 2's 

(2) JIW, Pfizer MAPS Project, Fire Alarm

Start 3/1/23, 6:00AM Start, Four Tens-Schedule for 4-5 months, Possible OT

Michigan State Journey License, On-site Drug Testing, 2 forms of ID required


  Hi-Tech Electric - #18

(1) JIW, Pfizer Portage Facility

Start: Monday 2/20/23, 7AM - 3:30PM, One Month Call

Required: MI State License, MUST Drug Test in last 30 days, Background Check, and

Covid Vaccination required.


     Hi-Tech Electric - Filled by CE

(1) CE, Commercial Work, Various Locations

Start: Monday, 2/20/2023, Indefinite Call

Required: MI State License, MUST Drug Test, Background Check, COVID-19 Vaccination


   Climax Solar - #19 & Book 2

(2) JIW, Residential Solar Work, Various Locations

Start: 2/13/23 @ 6:00AM M-F, Indefinite Call

MI State License Required, Long Hours, Shift Length Varies


   Flemington Instrument (#8)

(1) JIW, Pfizer Portage Site

Start: 2/14/23 @ 6:45AM, 6 Month Call, OT Available

Michigan State Journeyman Licenses, 2 forms of ID, Online Orientation to be completed Friday by 3PM for Tuesday Start


   Flemington Instrument - (#1 & #17)

(2) JIW, Pfizer Portage Site

Start: 2/6/23 @ 6:45AM, 5-6 Month Call, OT Available

Michigan State Journeyman Licenses & 2 forms of ID


   Schwartz Electric - (#5)

(1) JIW, Heartland RV (new construction), Sturgis MI

Start 1/30/23, 7AM to 3:30PM, M-F, Indefinite

Michigan State Journeyman License & 2 forms of ID Required


    FE Moran (Book 1 - #1, #3)

(2) JIW, Pfizer MAPS Project, Fire Alarm

Start 1/30/23 *corrected*, 6:30AM Start,  Four Tens-Schedule for 4-5 months

Michigan State Journey License, On-site Drug Testing, 2 forms of ID required


   Moore Electric - Book 1 (#1 & #27), (1) Book 2

(0 of 3 open) JIW, Pfizer Shutdown Work, Portage

Start 1/25/23, 7AM to 3:30PM, OT during 3-week shutdown beginning 2/22/23

MI State License, Background Check, MUST Drug Test within 30 days before reporting to work,

COVID-19 Vaccination Required

Paperwork & orientation must be completed by noon Friday to report Monday


   Moore Electric Filled Book II

          (2) JIW, Pfizer Portage Site

Start 1/23/23, 7AM Start, 10 hours Monday thru Friday, 8 Hours Sat.

MI State License, MUST Drug Test within 30 days before reporting to work, COVID-19 Vaccination,

Paperwork & orientation must be completed by noon Friday to report Monday


   Hi-Tech Electric

(1) CE, Various Locations

Start 1/23/23, 7AM to 3:30PM

MI State License Required


   Moore Electric - #21, #23, (2) Book 2

(4 of 4 filled) JIW, Pfizer Shutdown Work, Portage

Start 1/16/23, 7AM to 3:30PM, OT during 3-week shutdown beginning 2/22/23

MI State License, MUST Drug Test within 30 days before reporting to work, COVID-19 Vaccination,

Paperwork & orientation must be completed by noon Friday to report Monday


   Nitro Electric - Book 2

(1) JIW, Aldis, Sturgis Michigan

Start 1/9/23, 7AM to 3:30PM, 2 weeks

Michigan State Electrical License Required


   KEI Electric - 2 Book 1

 (2) JIW, Various Locations

Start 1/5/23, 40 hrs 7AM-3:30, Indefinite

Current MUST Drug Test required


  Schwartz Electric

(1) JIW, Heartland RV, Sturgis MI

Start 12/27/22, 7AM to 3:30PM, Indefinite 

Michigan State License and 2 forms of ID Required


   Climax Construction

(1) CE, Residential Solar, various locations

Start 12/23/22, 6AM Start, Indefinite Call

Current MUST Drug Test and Background Check Required


   Moore Electric - filled by #38, 36, & (2 Book 2's)

(1 of 4 open) JIW, Pfizer Portage Site

Start 12/19/22, Indefinite, 7AM to 3:30 PM 40 hours-a-week

Full Covid-19 Vaccination Required, Must Drug Test last 30 days before reporting to site, 2-3 day background check before reporting to site, Masks required on site


   Climax Construction

            (1) CE, Residential Solar, various locations

            Start 12/13/22, 6AM Start, Indefinite Call

            Current MUST Drug Test and Background Check Required 


   Hi-Tech Electric 

            (1) CE, Service Truck 

            Start 12/12/22, 1st Shift

            Michigan State License Required


   IBID County Electric Book I #8, #22, #34, #39, #40 Book II #8

           (6) JIW, Welch Foods Inc, Lawton MI

           Start 11/22/22, 6AM to 4:30PM, 7 Days a Week for 2 Months

           Michigan State License and Masks are required on site


   IBID County Electric - Filled by (4) Book 2's (daybook)

           (0 of 4 open) JIW, Welch Foods Inc, Lawton MI

           Start 11/16/22, 6AM to 4:30PM, 7 Days a Week for 2 Months

           Michigan State License and Masks are required on site


   Shaum Electric - Filled by Book I #36 & day book,  (3) Book 2, 

           (0 of 5 Open) JIW Tekmodo Moldings, Three Rivers

           Start 11/07/22, 7AM to 3:30PM, 5 Month Call

           Michigan State Journey License Required


   Moore Electrical (Filled by # 1, #39, 2 Book 2's)

           (4) JIW, Pfizer

           Starting Monday, October 31st; 7:00am-3:30pm

           Required: MUST Drug Test (within 60 days), MI State License, Background Check (2-3           days), COVID Vaccination


   Climax Solar -

CE, Commercial/Residential Solar Work

Start 9/27 at 6:00am with Regular OT

Michigan State License Required.


   IBID County Electric 

(1) CE, Welch's, Paw Paw; Existing Food Processing Facility, New Equipment

Start November 7th; Duration 2-3 Months 

4 x 10's, OT Fridays & Saturdays, Working some Sundays, 6 AM Start

Required: MI State License, Masks, Safety Toed Shoes & Glasses


     IBID County Electric - Filled by #3, #4 & Book 2

(3) JIW, Welch's, Paw Paw; Existing Food Processing Facility, New Equipment

Start November 2nd; Duration 2-3 Months

4 x 10's, OT Fridays & Saturdays, Working some Sundays

Required: MI State License, Masks, Safety Toed Shoes & Glasses


       IBID County Electric - Filled by #39 & 40, Book 2

(3) JIW, Welch's, Paw Paw; Existing Food Processing Facility, New Equipment

Start October 26th; Duration 2-3 Months 

4 x 10's (Mon-Thurs); OT on Fri, Sat, and Some Sundays

Required: MI State License, Masks, Safety Toed Shoes & Safety Glasses


   J-Ranck - Filled by #10

          (1) JIW, Various Location, Pump Stations

          Start 10/24/22, 7AM-5:30PM, 4-10 Sched.

          2 Forms of ID Required


       Shaum Electric - Filled by Book I # 10 & 31

          (2) JIW Tekmodo Moldings, Three Rivers

          Start 10/17/22, 7AM to 3:30PM, 6 Month Call

          Michigan State Journey License Required


   Climax Solar - Filled by #42

          (1) JIW, Residential/Service Solar Work

          Start 10/10/22, 6AM start with regular OT

          Michigan State License Required


    Moore Electric

         (1) CE3, Zoetis Farms, Kalamazoo

         Start 10/5/22, 7AM to 3:30PM, Indefinite

         Must Drug Test and Background Check require


    IBID County Electric - Filled by Book 1 #1

(1) JIW, Welch's, Paw Paw

4x10's with OT on Friday & Saturday; 2-3 Month Call. 

Michigan state license, safety glasses, hardhat, steel toed shoes, and masks are all required.


    Lakeland Electrical - (2) Book 2 #36 & (1) Book 1 Daybook

(0 of 3 Open) JIW, Pfizer MAPS, Portage

Start Monday, October 3rd. Long Call. 7:00AM-3:30PM M-F; OT When Necessary

Onsite & Random drug testing; Background Check Required

No COVID vaccination or mask mandate required.


    Ibid County Electric - (Filled by Book 2)

         (1) JIW, Welch's in Lawton, MI

         Start 9/29/22, hours 6AM to 4:30 PM, 4/10's with OT on Friday and Saturday

         MI State Journeyman Electrical License, Masks, and PPE required.


    Moore Electric (Book I #13, Book I Day Book, Book II - Day Book x 2)

          (0 of 4 open) JIW, Zoetis (Various Locales), 

          Start 9/29/22, OVERTIME; 6AM to 3:30 PM M-F

          MUST Drug test within 30 days of Hire, Background Check required


    Moore Electric - Filled by #42

          (2) JIW, Pfizer Portage Site

          Start 9/28/22, 7 AM to 3:30 PM, M-F

          Current Must drug test (within 30 days of hire), Background Check, Covid-19 Vaccination,

          and Masks are required


 Lakeland Electric (Book I #43, #43)

(2) JIW, Pfizer Maps, Kalamazoo

Start Monday, September 26, Long Call, 7:00AM to 3:30PM, OT When Necessary

Onsite & Random Drug Testing, Background Check Required.

No COVID Vaccines or Masks Needed


    Moore Electrical - Filled by Book 1 #39

          (1) JIW, Zoetis, Kalamazoo

          Start 9/12, Long Call, 7:00AM to 3:30PM

          Current MUST Drug Test, Background Check, and MI State License Required


      Schwartz Electric -Filled by Book1 #44, #42

           (2) JIW, Sturgis Michigan, New Industrial Build

           Start 9/9, Long Call, 7AM to 3:30PM

           Current Must Drug Test and MI State Journeyman License Required


    Lakeland Electric - Filled by (2) Book 1 #32 & #44 and (2) Book 2

           (4) JIW, Pfizer MAPS Project, New build pharmaceutical facility 

           Start, Long Call 6+ Months, 7:00AM to 3:30PM, OT as needed

           On-Site Drug Testing Required, may be subject to random testing. Background Check required. 

  No Covid-19 Vaccine requirement.


     KEI Electric - Filled by (3) Book 1: #40, #47, #41 & (4) Book 2

            (7) JIW, Day Shift for Graphic Packaging Annual Shutdown

            Report 9/9 for paperwork. Shutdown is 4 days, 9/12 to 9/15.

            First Shift, 12 hours, 6AM-6PM


        KEI Electric - Filled by (1) Book 1: #39 & (4) Book 2's

            (5) JIW, Night Shift for Graphic Packaging Annual Shutdown

            Report 9/9 for paperwork. Shutdown is 3 nights minimum, 9/12 to 9/14.

            Night Shift, 12 hour, 6PM-6AM, All hours paid @ OT (1.5x)


        Lakeland Electric 

            No JIW Call at this time, previous call due to request error


        Brite Electric

            (1) JIW, Drive and Shine (S Westnedge), Kalamazoo 

            Start 8/31/22, 7AM to 3:30 PM, 8 to 12 weeks

            Michigan State Journeyman License is required


        Hi Tech Electric

           (1) CE, Commercial and Industrial 

            Start 8/25/2022, Indefinite 


            Climax Solar

          (1) CE for Residential Solar Work

          Start 8/29/22, 6AM 


      IBID County Electric

          (1) JIW, Welch's Foods (Lawton, MI)

          Start, 8/23, 4-10s, Mon-Thurs, likely Friday (OT) as well. 6:00AM to 4:30PM

          MI State License Required


      Lakeland Electric 

         (2) JIW, Pfizer MAPS Project 

         Start 8/23/22, 12-24 month Call, 7:00AM to 3:30PM

         On-Site Drug Testing Required, may be subject to random testing. Background Check required. (Edit) No Covid-19 Vaccine requirement.


 Climax Solar

              (1) CE, Residential Solar Service

        Start: 8/15/22

        MI State License Required


        Shaum Electric

               (1) JIW, New Construction, Three Rivers, MI

                Start:8/10/22, Duration: 6-8 Months, M-F 7AM-3:30PM

        MI State License, Lift certification Required, 2-forms of ID required for Hiring Papers


      Moore Electric

         (2) JIW, Pfizer-Portage - (1) Cancelled

         Start 08/9/22, Indefinite call 7:00AM to 3:30PM

         Drug Test within last 30 Days, MI Lic. Journeyman, Background Check, Cov-19 Vaccine, Masks

Required onsite


 Martell Electric

        (1) JIW, Gull Lake Middle School

        Start 8/8, Short Call 1-2 weeks

        4-10 Schedule

        Drug Test Required within 30 days of start


 Climax Solar

               (1) JIW, Residential Solar Work

                Start 8/3Long Term/Indefinite Call

            6:00AM to 5:00PM, Regularly available OT.  Some Mondays Off

         MI Journeyman License Required


         Moore Electrical

                (1) JIW, Pfizer - Misc.

         Report to Moore Shop on 8/3/22

         40+ hrs - Occasional OT as needed

         Drug Test within last 30 days, Background Check, Covid-19 Vaccine, and Masks required


What's Going on at 131? 

  

 IBEW Local 131 is open for business.  We prefer Book 2 signs done by home locals, but we're open for in person signs.  Our office is closed from 11:30am-12:30pm for lunch.  

 Dues payments can now be accessed online.  Sign into your account today! (IBEW 131 Members Only - Username is your last name and the password is your Dues Receipt Card Number)

________________________________________________________________________

Interested in the IBEW 131?

Sign up for Fall Safety Classes

Apprenticeship Classes Starting in the Fall